WHAT DETERMINES RISK?
Project risk can be said to depend on three variables:
1. How well defined is the project? A well-defined project will set out in detail exactly what the project is to accomplish (the deliverables), when each stage should be completed, and how each stage will be appraised (quality). These qualities can be summed up in the phrase ‘project scope’. Additionally, it is important to set a cost budget in advance. We will see later that there can be tensions between cost, time, quality and scope, but if these have not been defined in the first place, the project will run into difficulties quickly as each member of the project team is likely to be pursuing different goals. A poorly defined project will be short on detail but long on grand ambition. For example, stating that the new IT system will improve inventory management is almost useless. Is the firm moving to just-in-time? Is it going to develop sophisticated demand-forecasting algorithms? Is the warehouse to be automated? Will labour and machine use be part of the system? In addition, if the project is not well defined, even if most participants happen to have a similar vision initially, the project will be susceptible to drift. This means that as the project progresses, ideas change and the project deliverables change. To some extent, project drift is inevitable because as the project is worked on, more information is discovered and it would be foolish not to take note and alter the project where necessary. However, altering projects part way through is usually expensive in terms of time and money if work has to be redone or abandoned. What must be avoided is ongoing, ‘nice-to-have’ project drift, in which new features are added little by little without proper evaluation of costs and benefits. By defining the project in detail at the start, the firm will have thought carefully about deliverables and the need for subsequent amendments should be minimised.
2. The size of the project. It is pretty obvious that there will be more risk associated with large projects. More stakeholders will be involved, possibly including customers and suppliers. There will be more coordination problems and the financial investment will be greater. Project failure, will cause great disruption and many people will be affected. By contrast, small projects will be easier to control and if they go wrong, damage is likely to be confined to a smaller number of stakeholders.
3. The technical sophistication of the project. A project which depends on well understood solutions is much less likely to go wrong than a project which is attempting to use cutting edge, experimental technology.
So, if you are put in charge of a large, poorly defined, sophisticated project, you might like to look round for another job, as if the project fails to deliver (and it probably will) you could be the number one scapegoat.
Of course, there can be a good business case for embarking on large sophisticated projects, as these can allow companies to differentiate their products and services. If standard, hesitant, safe solutions are always used then more ordinary performance will result. It might be part of a business’s strategy to adopt radical solutions to gain competitive advantage. However, there can never be any excuse for a project being ill defined at the start.
Risks must be managed and the following approach can be used:
1. Define the risks. What could go wrong?
2. Assess the risks. This will be a combination of estimating the financial effect if the risk event occurs, and the probability of the risk occurring. Some risks would have large financial consequences but could be very unlikely to happen. Others might have trivial financial consequences.
3. Prioritise the risks. What are the really serious events that need to be addressed first?
4. Deal with the risks. Generally, there are four approaches:
· Tolerate the risk, either because the event is unlikely to happen and/or the consequences will be immaterial.
· Treat the risk, or do something to ameliorate it. For example, if the consequences of missing a deadline are serious, have additional resources available that can be used to speed up the process if necessary.
· Transfer the risk. Insurance is a form of risk transfer, as is sub-contracting. So if you are worried about an IT project missing important deliverables, consider sub-contracting part of it and build in penalty clauses.
· Terminate the risk. In other words, the event would be so serious that you do not want to risk it occurring at all. For example, if there were a security breach during a project that requires sensitive data to be held, this could be devastating to a company, so the company might decide not to hold that data, despite it possibly yielding good marketing information.
高顿网校小编寄语:努力了,就无怨无悔。有道是:天道筹勤!相信自己,你是最棒的!
扫一扫微信,*9时间获取2014年ACCA考试报名时间和考试时间提醒
高顿网校特别提醒:已经报名2014年ACCA考试的考生可按照复习计划有效进行!另外,高顿网校2014年ACCA考试辅导高清课程已经开通,通过针对性地讲解、训练、答疑、模考,对学习过程进行全程跟踪、分析、指导,可以帮助考生全面提升备考效果。
报考指南:2014年ACCA考试备考指南
免费题库:2014年ACCA考试免费题库
考前冲刺:ACCA备考秘籍
高清网课:ACCA考试网络课程
报考指南:2014年ACCA考试备考指南
免费题库:2014年ACCA考试免费题库
考前冲刺:ACCA备考秘籍
高清网课:ACCA考试网络课程
版权声明:本条内容自发布之日起,有效期为一个月。凡本网站注明“来源高顿教育”或“来源高顿网校”或“来源高顿”的所有作品,均为本网站合法拥有版权的作品,未经本网站授权,任何媒体、网站、个人不得转载、链接、转帖或以其他方式使用。
经本网站合法授权的,应在授权范围内使用,且使用时必须注明“来源高顿教育”或“来源高顿网校”或“来源高顿”,并不得对作品中出现的“高顿”字样进行删减、替换等。违反上述声明者,本网站将依法追究其法律责任。
本网站的部分资料转载自互联网,均尽力标明作者和出处。本网站转载的目的在于传递更多信息,并不意味着赞同其观点或证实其描述,本网站不对其真实性负责。
如您认为本网站刊载作品涉及版权等问题,请与本网站联系(邮箱fawu@gaodun.com,电话:021-31587497),本网站核实确认后会尽快予以处理。
点一下领资料
【整理版】ACCA各科目历年真题
真题高频考点,刷题全靠这份资料
下载合集
acca全科学习思维导图
梳理核心考点,一图看懂全部章节
下载合集
2023年acca考纲解析
覆盖科目重难点,备考按照计划走
下载合集
acca备考 热门问题解答
- acca考试怎么搭配科目?
-
建议优先选择相关联的科目进行搭配报考,这样可以提高备考效率,减轻备考压力,1、F1-F4:为随时机考科目,难度较低,这里可以自行随意选择考试顺序。2、F5-F9:如果你的工作的和财务会计或者审计有关、或者你比较擅长财务和审计的话,推荐先考F7和F8。你可以选择一起考ACCA考试科目F7和F8或者先考F7(8)再考F8(7),这就要取决你一次想考几门。3、P阶段:选修科目中,建议企业首选AFM!第二部分科目进行选择,如果AA和SBR掌握学生更好,可以通过选择AAA,如果SBL掌握的好,可以自己选择APM。
- acca一共几门几年考完?
-
acca一共有15门考试科目,其中有必修科目和选修科目,考生需要考完13门科目才能拿下证书。
- acca一年考几次?
-
acca一年有4次考试,分别是3月、6月、9月和12月,分季机考科目是采取的这类四个考季的模式,而随时机考则是没有这方面的时间规定限制,可以随报随考。
- acca的含金量如何?
-
ACCA证书的含金量是比较高的,从就业、能力提升、全球认可等角度来说,都是比较有优势的证书,其含金量主要表现在以下几个方面:1、国际化,认可度高;2、岗位多,就业前景好;3、缺口大,人才激励。
严选名师 全流程服务
其他人还搜了
热门推荐
-
acca专业阶段考试科目有哪些?究竟都考些什么? 2023-04-23
-
accaP阶段科目考完需要多久?速戳了解! 2023-03-28
-
ACCA高级课程是哪几门?和基础课程比难度怎么样? 2023-03-17
-
sbr和sbl哪个难?accaP阶段先考哪个? 2023-03-16
-
accaP阶段报名费是多少?一文介绍全了! 2023-03-14
-
accaP阶段有哪些科目?各科目详细介绍! 2023-03-14
-
accap阶段考试顺序是怎样的?选修科目怎么选? 2023-03-10
-
acca考试科目:《ATX高级税务》重点详解! 2023-03-06
-
acca考试科目:《APM高级业绩管理》重点详解! 2023-03-06
-
acca考试科目:《AFM高级财务管理》重点详解! 2023-03-06
-
accap阶段有效期是多久?需要几年内考完? 2023-03-01
-
accaP阶段选修选哪两门?各科难度对比来了! 2023-02-28
-
2023年acca的sbl怎么学?点击查收备考攻略! 2023-02-24
-
acca考试p阶段科目题型,附各科分值参考! 2023-02-23
-
accap阶段要考几门?重难点是什么? 2023-02-10
-
accap阶段要考几门?重难点是什么? 2023-02-10
-
accaP阶段科目怎么搭配?先考哪门? 2023-02-09
-
ACCA专业P阶段:《AFM高级财务管理》复习攻略 2023-01-30
-
accap阶段选哪两门?考试重难点介绍! 2023-01-17
-
acca考试科目:《AAA高级审计与鉴证》题型及重点! 2023-01-17
-
acca专业阶段考试难度分析,选修科目报考指南来了! 2023-01-12
-
accap阶段报考顺序推荐,先报哪个好? 2022-12-15
-
ACCAp阶段一次最多考几门?成绩有效期是多久? 2022-08-24
-
ACCA的p阶段需要备考多久才够?考试难度怎么样? 2022-08-18
-
ACCAp阶段考试需要考几门?考试时间是哪天? 2022-08-15
-
ACCA考试P阶段考几门?P阶段成绩有效期是多久? 2022-08-12
-
ACCAP阶段科目难度高吗?P阶段是机考吗? 2022-08-10
-
ACCA最后四门难考吗?通过率怎么样? 2022-07-19
-
ACCA英语不好怎么办?怎么提高英语? 2022-07-14
-
ACCA机考报名时间是什么时候?怎么报考? 2022-07-14