试题回顾,ACCA考试《公司报告P2》知识辅导4
来源:
高顿网校
2015-03-18
博学之,审问之,慎思之,明辨之,笃行之。 高顿网校为广大学员提供2015年ACCA考试网络课程,助您一臂之力,2015年考试顺利通过!祝您梦想成真!免费听课》
RELEVANT TO ACCA QUALIFICATION PAPER P2
Provisions
The Paper P2 examiner often features one question per exam that focuses on a single International Financial Reporting Standard (IFRS)。 But be warned – while these questions take their lead from a single IFRS, the examiner also brings in other issues from other IFRS.
The December 2010 exam included a share-based payment question called Margie. Before that, in the December 2009 exam, there was a question on impairment and, in June 2009, another on financial instruments.In the last exam, the Margie question was not just about share-based payment.It also included financial instruments, fair value and simple share issues. Also,the question was highly analytical. There were few marks for regurgitation of knowledge. The bulk of the marks were reserved for analysis.So to give you an idea of how these questions work, and to revisit a subject that has not been the subject of focus for a while, I am going to resurrect an old Paper P2 question called Satellite. It is a focus question that looks at provisions, but also has plenty of other accounting issues to consider. Of course, I have had to change the question slightly to bring it up to date.The purpose of this article is to give you a feel as to how to tackle such questions.
Satellite
Satellite, a public limited company, has produced draft consolidated financial
statements as at 30 November. The group accountant has asked your advice
on several matters. These issues are set out below and have not been dealt
with in the draft group financial statements:
1 Satellite has buildings under an operating lease. A requirement of the
operating lease for the corporate offices is that the asset is returned in
good condition. The operating lease was signed in the current year and
lasts for six years. Satellite intends to refurbish the building in six years’
time at a cost of $6m in order to meet the requirements of the lease.
This amount includes the cost of renovating the exterior of the building
and is based on current price levels. Currently, there is evidence that due
to severe and exceptional weather damage the company will have to
spend $1.2m in the next year on having the exterior of the building
renovated. The company feels that this expenditure will reduce the
refurbishment cost at the end of the lease by an equivalent amount.
There is no provision for the above expenditure in the financial
statements. (3 marks)
2PROVISIONS
APRIL 2011
2 An 80% owned subsidiary company, Universe, has a leasehold property
(historical cost $8m, acquired at the year start)。 It has been modified to
include a sports facility for the employees. Under the terms of the lease,
the warehouse must be restored to its original state when the lease
expires in 10 years’ time or earlier termination. The present value of the
costs of reinstatement are likely to be $2m measured at the year start
and the directors wish to provide for $200,000 per annum for 10 years.
The lease was signed and operated from the current year start and the
modifications occurred immediately after. The directors estimate that
the lease has a recoverable value of $9.5m at 30 November year-end and
have not provided for any of the above amounts. (9 marks) 3 Additionally, Satellite owns buildings at a carrying value of $20m, which
will require repair expenditure of approximately $6m over the next five
years. No provision has been made for this amount in the financial
statements and depreciation is charged on leasehold buildings at 10%
per annum and on owned buildings at 5% per annum, on the straightline
basis. (3 marks)
4 Universe has developed a database during the year to 30 November and
it is included in intangible non-current assets at a cost of $3m. The asset
comprises the internal and external costs of developing the database.
The cost of such intangible assets is amortised over five years and one
year’s amortisation has been charged. The database is used to produce
a technical accounting manual, which is used by the whole group and
sold to other parties. Net revenue of $2m is expected from sales of the
manual over its four-year life. It has quickly become a market leader in
this field. Any costs of maintaining the database and the technical
manual are written off as incurred. The technical manual requires
substantial revision every four years. Therefore, Universe is considering
providing for the cost of revision. (2 marks)
5 Satellite purchased a wholly owned subsidiary company, Globe, on 1
December, at the prior year start. The vendors commenced a legal action
on 31 March during the current year over the amount of the purchase
consideration, which was based on the performance of the subsidiary. An
amount had been paid to the vendors and included in the calculation of
goodwill but the vendors disputed the amount of this payment. The court
made a decision on 30 November at the current year-end that requires
Satellite to pay an additional $8m to the vendors within three months.
The directors do not know how to treat the additional purchase
consideration and have not accounted for the item. (3 marks)
3PROVISIONS
APRIL 2011
Required
(a) Discuss the recognition criteria for the recognition of a provision (IAS
37)。 (5 marks)
(b) Discuss how the above five issues should be dealt with in the group
financial statements of Satellite. (20 marks)
(Total: 25 marks)
Possible answer
The marking guide was based on the usual one mark per idea well expressed.
So the following would look good on a marker’s screen.
(a)
Three
There are three recognition criteria.
Reasonably reliable estimate
It must be possible to make a reasonably reliable estimate of the outflow that
will result from the obligation before a provision is permitted.
Obligation
There must be a present legal or constructive obligation at the year-end before
a provision is permitted.
Transfer
There must be an expectation that economic benefit will flow out in the future
as a result of the obligation.
Comment
Frankly, the IAS argues it is always possible to estimate the outflow and it is
very rare for a transfer out to be avoidable. So, in practice, the accountant can
focus purely on the obligation criteria.
Framework
Perhaps it should be noted how the above closely follows the focus of the
framework on assets and liabilities. The framework also defines a liability in
terms of present obligations.4PROVISIONS
APRIL 2011
1 Operating lease
Actually, it is irrelevant whether the above is operating or finance lease in the
context of analysing related provisions. Either type of lease creates an
obligation.
Present obligation
But the trick here is to spot the present obligation. Satellite does have a
present obligation for the damage done during the tenure ($1.2m) but not for
the damage that might be done in the future (maybe $4.8m)。
Conclusion
So Satellite should provide $1.2m and should probably recognise the charge to
the p/l as super-exceptional on the face of the income statement given its
unusual nature.
2 Universe
First we must eye this problem form the perspective of the subsidiary. It is the
subsidiary that will be putting through the double entry. Then we can look at
the effect on the group.
Modification
The key term in this paragraph is ‘modify’。 We can see that Universe already
has made the modifications and therefore has a present obligation as a result
of this past obliging event.
Provision
So a provision is required for the cost of restoration. The provision is required
at the point of modification. The modification occurred at the year start.
Measurement
However, the restoration will not take place until the end of the lease; so the
time value of money must be considered. But we need to be careful here, as
the $2m is already discounted.
Double entry
So the year start double entry is:
Dr Non-current asset $2m
Cr Provision $2m
5
PROVISIONS
APRIL 2011
? 2011 ACCA
Non-current asset
In fact, the above non-current asset entry goes on top of the initial premium:
Premium $8m
Restoration $2m
_____
Initial cost $10m
Depreciation
Then, of course, the above is depreciated over its life, which is 10 years.
Depreciation double entry
This is the same every year: Dr i/s $1m
Cr NCA $1m
Unwinding
And, of course, quite separately the liability unwinds. The scenario does not tell
us the discount rate, so I have assumed 10%.
Unwinding double entry
This snowballs every year (grows exponentially), but the first year journal would
be as follows:
Dr i/s $0.2m
Cr Prov ($2m)(10%) $0.2m
Impairment test
There is even data for an impairment test. However, there is no impairment as
the carrying value of the asset at the year-end ($9m) is less than the
recoverable value ($9.5m)。
Group effect
The above double entry will be accommodated by the sub. However, because
this is a partially owned sub, the group/non-controlling interest effect will be
80%/20%.
3 Repairs
There appears to be no obligation for the repairs. Just an intent to repair
sometime in the future.
Conclusion
So I suggest there can be no provision for the repairs.
6
PROVISIONS
APRIL 2011
? 2011 ACCA
Depreciation
Buildings should be depreciated over their useful lives regardless of being
owned or otherwise.
4 Intangible
An intangible is recognised if it is purchased. Also, development is recognised
if it is recoverable. It sounds like the external costs are the former and the
internal costs are the latter.
Conclusion
So it appears to be reasonable to capitalise and depreciate the asset.
However, I would advise Satellite to adjust the life down to four years, as that
appears to be more realistic. Also, there is no obligation to revise. So no
provision is possible.
5 Goodwill
Clearly, if Satellite had predicted the extra $8m, it would have put it in the
consideration and the acquisition goodwill would have been higher.
Prior period adjustment (PPA)
But the only way to adjust last year’s goodwill is via a PPA (restatement)。 This
is only permissible if the $8m is a material error. But to me it sounds like a
change in an estimate. So the $8m will simply have to be costed to the i/s.
IFRS 3
IFRS 3 supports this view, by giving a 12 months’ limit on playing with goodwill
after acquisition.
Conclusion
I hope the above gave you a feel for how you can think about addressing a
focus question and how to address wider issues so that you can broaden your
analysis.
Martin Jones is a lecturer at the London School of Business and Finance
小编寄语:成功的人是跟别人学习经验,失败的人只跟自己学习经验。
ACCA网络课程 | 课程专业名称 | 讲师 | 试听 |
85%的人正在学习该课程 | ACCA 全维度网课体验课程 实景课堂与独立录制 覆盖所有知识点,根据学习计划推进学习进度 | 高顿名师 | |
70%的人正在学习该课程 | ACCA网课全科卡(8.2折) 为零基础刚开始学习ACCA的学员特别定制 | 高顿名师 |
精彩推荐:
版权声明:本条内容自发布之日起,有效期为一个月。凡本网站注明“来源高顿教育”或“来源高顿网校”或“来源高顿”的所有作品,均为本网站合法拥有版权的作品,未经本网站授权,任何媒体、网站、个人不得转载、链接、转帖或以其他方式使用。
经本网站合法授权的,应在授权范围内使用,且使用时必须注明“来源高顿教育”或“来源高顿网校”或“来源高顿”,并不得对作品中出现的“高顿”字样进行删减、替换等。违反上述声明者,本网站将依法追究其法律责任。
本网站的部分资料转载自互联网,均尽力标明作者和出处。本网站转载的目的在于传递更多信息,并不意味着赞同其观点或证实其描述,本网站不对其真实性负责。
如您认为本网站刊载作品涉及版权等问题,请与本网站联系(邮箱fawu@gaodun.com,电话:021-31587497),本网站核实确认后会尽快予以处理。
点一下领资料
【整理版】ACCA各科目历年真题
真题高频考点,刷题全靠这份资料
下载合集
acca全科学习思维导图
梳理核心考点,一图看懂全部章节
下载合集
2023年acca考纲解析
覆盖科目重难点,备考按照计划走
下载合集
acca备考 热门问题解答
- acca考试怎么搭配科目?
-
建议优先选择相关联的科目进行搭配报考,这样可以提高备考效率,减轻备考压力,1、F1-F4:为随时机考科目,难度较低,这里可以自行随意选择考试顺序。2、F5-F9:如果你的工作的和财务会计或者审计有关、或者你比较擅长财务和审计的话,推荐先考F7和F8。你可以选择一起考ACCA考试科目F7和F8或者先考F7(8)再考F8(7),这就要取决你一次想考几门。3、P阶段:选修科目中,建议企业首选AFM!第二部分科目进行选择,如果AA和SBR掌握学生更好,可以通过选择AAA,如果SBL掌握的好,可以自己选择APM。
- acca一共几门几年考完?
-
acca一共有15门考试科目,其中有必修科目和选修科目,考生需要考完13门科目才能拿下证书。
- acca一年考几次?
-
acca一年有4次考试,分别是3月、6月、9月和12月,分季机考科目是采取的这类四个考季的模式,而随时机考则是没有这方面的时间规定限制,可以随报随考。
- acca的含金量如何?
-
ACCA证书的含金量是比较高的,从就业、能力提升、全球认可等角度来说,都是比较有优势的证书,其含金量主要表现在以下几个方面:1、国际化,认可度高;2、岗位多,就业前景好;3、缺口大,人才激励。
严选名师 全流程服务
其他人还搜了
热门推荐
-
acca专业阶段考试科目有哪些?究竟都考些什么? 2023-04-23
-
accaP阶段科目考完需要多久?速戳了解! 2023-03-28
-
ACCA高级课程是哪几门?和基础课程比难度怎么样? 2023-03-17
-
sbr和sbl哪个难?accaP阶段先考哪个? 2023-03-16
-
accaP阶段报名费是多少?一文介绍全了! 2023-03-14
-
accaP阶段有哪些科目?各科目详细介绍! 2023-03-14
-
accap阶段考试顺序是怎样的?选修科目怎么选? 2023-03-10
-
acca考试科目:《ATX高级税务》重点详解! 2023-03-06
-
acca考试科目:《APM高级业绩管理》重点详解! 2023-03-06
-
acca考试科目:《AFM高级财务管理》重点详解! 2023-03-06
-
accap阶段有效期是多久?需要几年内考完? 2023-03-01
-
accaP阶段选修选哪两门?各科难度对比来了! 2023-02-28
-
2023年acca的sbl怎么学?点击查收备考攻略! 2023-02-24
-
acca考试p阶段科目题型,附各科分值参考! 2023-02-23
-
accap阶段要考几门?重难点是什么? 2023-02-10
-
accap阶段要考几门?重难点是什么? 2023-02-10
-
accaP阶段科目怎么搭配?先考哪门? 2023-02-09
-
ACCA专业P阶段:《AFM高级财务管理》复习攻略 2023-01-30
-
accap阶段选哪两门?考试重难点介绍! 2023-01-17
-
acca考试科目:《AAA高级审计与鉴证》题型及重点! 2023-01-17
-
acca专业阶段考试难度分析,选修科目报考指南来了! 2023-01-12
-
accap阶段报考顺序推荐,先报哪个好? 2022-12-15
-
ACCAp阶段一次最多考几门?成绩有效期是多久? 2022-08-24
-
ACCA的p阶段需要备考多久才够?考试难度怎么样? 2022-08-18
-
ACCAp阶段考试需要考几门?考试时间是哪天? 2022-08-15
-
ACCA考试P阶段考几门?P阶段成绩有效期是多久? 2022-08-12
-
ACCAP阶段科目难度高吗?P阶段是机考吗? 2022-08-10
-
ACCA最后四门难考吗?通过率怎么样? 2022-07-19
-
ACCA英语不好怎么办?怎么提高英语? 2022-07-14
-
ACCA机考报名时间是什么时候?怎么报考? 2022-07-14