2014年ACCA《公司法与商法》真题及答案八

来源: 高顿网校 2015-07-20
    高顿小编为各位ACCA学员整理了历年考试真题,希望大家查漏补缺,对考试有所帮助。
       Question:
  Apt Ltd is a small independent book company, which specialises in publishing modern poetry. In January 2013 itsigned a contract with a new poet, called Bel, to publish her second book of poems in August 2014. In March 2013, Bel won a prestigious award for her first book of poems, which had been published privately.
  In the light of the fame which now attached to Bel, Apt Ltd launched an extensive advertising campaign publicising the forthcoming book. The campaign was expensive, costing ?50,000, but it was successful in generating great interest. As a result, Apt Ltd won a contract to supply a large book club with 100,000 copies of the book, which would make them a profit of ?250,000.
  Unfortunately in May 2014, Bel informed Apt Ltd that she would not be able to supply the manuscript to it as she had signed a more rewarding contract with Cax plc, a very large publishing company.
  Required:
  In the context of Bel’s anticipatory breach of contract, explain any possible remedies open to Apt Ltd.
  Answer:
  The essential issues to be disentangled from the problem scenario relate to breach of contract and the remedies available for such breach.
  There is clearly a binding contractual agreement between Art Ltd and Bel, which Bel has stated she intends to break. Normally breach of a contract occurs where one of the parties to the agreement fails to comply, either completely or satisfactorily, with their obligations under it. However, such a definition does not appear to apply in this case as the time has not yet come when Bel has to produce the manuscript. She has merely indicated that she has no intention of doing so. This is an example of the operation of the doctrine of anticipatory breach. This arises precisely where one party, prior to the actual due date of performance, demonstrates an intention not to perform their contractual obligations. The intention not to fulfil the contract can be either express or implied.
  Express anticipatory breach occurs where a party actually states that they will not perform their contractual obligations (Hochster v De La Tour (1853)). Implied anticipatory breach occurs where a party carries out some act which makes performance impossible (Omnium Enterprises v Sutherland (1919)).
  When anticipatory breach takes place, the innocent party can sue for damages immediately on receipt of the notification of the other party’s intention to repudiate the contract, without waiting for the actual contractual date of performance as in Hochster v De La Tour. Alternatively, they can wait until the actual time for performance before taking action. In the latter instance, they are entitled to make preparations for performance, and claim the agreed contract price (White and Carter (Councils) v McGregor (1961)).
  It would appear that Bel’s action is clearly an instance of express anticipatory breach and that Art Ltd has the right either to accept the repudiation immediately, or affirm the contract and take action against Bel at the time for performance (Vitol SA v Norelf Ltd (1996)). In any event, Bel is bound to complete her contractual promise or suffer the consequences of her breach of contract.
  Remedies for breach of contract
  (i) Specific performance
  It will sometimes suit a party to break their contractual obligations, even if they have to pay damages. In such circumstances, the court can make an order for specific performance to require the party in breach to complete their part of the contract. However, as specific performance is not available in respect of contracts of employment or personal service, Bel cannot be legally required to provide the manuscript to Apt Ltd (Ryan v Mutual Tontine Westminster Chambers Association (1893)). This means that the only remedy against Bel lies in the award of damages.
  (ii) Damages
  A breach of contract will result in the innocent party being able to sue for damages. Apt Ltd, therefore, can sue Bel for damages, but the important issue relates to the extent of such damages.
  Damages in contract are intended to compensate an injured party for any financial loss sustained as a consequence of another party’s breach. The object is not to punish the party in breach, so the amount of damages awarded can never be greater than the actual loss suffered. The aim is to put the injured party in the same position they would have been in had the contract been properly performed.
  The rule in Hadley v Baxendale (1845) states that damages will only be awarded in respect of losses which arise naturally, or which both parties may reasonably be supposed to have contemplated when the contract was made, as a probable result of its breach.
  The effect of the first part of the rule in Hadley v Baxendale is that the party in breach is deemed to expect the normal consequences of the breach, whether they actually expected them or not. Under the second part of the rule, however, the party in breach can only be held liable for abnormal consequences where they have actual knowledge that the abnormal consequences might follow (Victoria Laundry Ltd v Newham Industries Ltd (1949)).
  Applying these rules to the scenario, it is evident that Bel has effected an anticipatory breach of her contract with Apt Ltd and will be liable to it for damages suffered as a consequence.
  As for the extensive preliminary expenses, Bel would certainly be liable for them, as long as they were in the ordinary course of Apt Ltd’s business and were not excessive (Anglia Television v Reed (1972)).
  As regards the profits from the contract to supply the book club, the issue would be as to whether this was normal profit or amounted to an unexpected gain, as it was not part of Apt Ltd’s normal market when the contract was signed. If Victoria Laundry Ltd v Newham Industries Ltd were to be applied, it is unlikely that Apt Ltd would be able to claim that loss of profit from Bel. However, it is equally plausible that the contract was an ordinary commercial one and that Bel would have to recompense Apt Ltd for any losses suffered from its failure to complete contractual performance.
  高顿网校温馨提醒
  各位考生,2015年ACCA备考已经开始,为了方便各位学员能更加系统地掌握考试大纲的重点知识,帮助大家充分备考,体验实战,高顿网校开通了全免费的ACCA题库(包括精题真题和全真模考系统),题库里附有详细的答案解析,学员可以通过多种题型加强练习。戳这里进入ACCA免费题库>>>
 
ACCA网络课程课程专业名称讲师试听
85%的人正在学习该课程ACCA 全维度网课体验课程
实景课堂与独立录制
覆盖所有知识点,根据学习计划推进学习进度
高顿名师
70%的人正在学习该课程ACCA网课全科卡(8.2折)
为零基础刚开始学习ACCA的学员特别定制
高顿名师

acca备考 热门问题解答
acca考试怎么搭配科目?

建议优先选择相关联的科目进行搭配报考,这样可以提高备考效率,减轻备考压力,1、F1-F4:为随时机考科目,难度较低,这里可以自行随意选择考试顺序。2、F5-F9:如果你的工作的和财务会计或者审计有关、或者你比较擅长财务和审计的话,推荐先考F7和F8。你可以选择一起考ACCA考试科目F7和F8或者先考F7(8)再考F8(7),这就要取决你一次想考几门。3、P阶段:选修科目中,建议企业首选AFM!第二部分科目进行选择,如果AA和SBR掌握学生更好,可以通过选择AAA,如果SBL掌握的好,可以自己选择APM。

acca一共几门几年考完?

acca一共有15门考试科目,其中有必修科目和选修科目,考生需要考完13门科目才能拿下证书。

acca一年考几次?

acca一年有4次考试,分别是3月、6月、9月和12月,分季机考科目是采取的这类四个考季的模式,而随时机考则是没有这方面的时间规定限制,可以随报随考。

acca的含金量如何?

ACCA证书的含金量是比较高的,从就业、能力提升、全球认可等角度来说,都是比较有优势的证书,其含金量主要表现在以下几个方面:1、国际化,认可度高;2、岗位多,就业前景好;3、缺口大,人才激励。

在线提问
严选名师 全流程服务

Sdanvi

高顿ACCA全学科负责人

教学特色
自创“少女三大法则”和“二阶学习法”
教学资历
两年内高分通过ACCA考试,ACCA业界学霸型讲师
客户评价
帮助学生快速理解ACCA的知识点,是ACCA学习不可错过的宝藏博主
sdanvi
  • 老师好,考出ACCA的难度相当于考进什么大学?
  • 老师好,ACCA考试怎样备考(越详细越好)?
  • 老师好,38岁才开始考ACCA会不会太迟?
  • 老师好,ACCA通过率是多少?
  • 老师好,有了ACCA证后好找工作吗?
999+人提问

Perry

高顿acca明星讲师

学历背景
复旦-麻省理工国际工商管理硕士
教学资历
曾就职于四大、世界500强
客户评价
ACCA业界学霸型讲师
Perry
  • 老师好,acca如果不去考会怎么样?
  • 老师好,acca难度有多大?
  • 老师好,acca一年可以考多少门?
  • 老师好,acca考试科目几年考完?
  • 老师好,acca工资一般是多少钱?
999+人提问

Dora

高顿acca明星讲师

学历背景
英国布里斯托优秀硕士生
教学资历
多年普华永道金融组审计师经验
客户评价
知性又美丽,温柔大姐姐
Dora
  • 老师好,acca持证工资待遇如何?
  • 老师好,35岁考acca有意义吗?
  • 老师好,考过acca能干嘛?
  • 老师好,考完acca可以做什么工作?
  • 老师好,acca年薪一般多少?
999+人提问

高顿教育 > ACCA > 考试试题