Question:What is the name given to the date on which a forward rate agreement is dealt?
A. Fixing date
B. Trade date
C. Maturity date
D. Settlement date
The correct answer is:Trade date.
The Settlement Date is the date on which contracts settle with a single cash payment made on the first day of the underlying loan.
The Fixing Date is the date when the reference rate is determined.
The Maturity Date is the date on which the notional loan or deposit expires.
  高顿网校温馨提醒
  各位考生,2016年ACCA备考已经开始,为了方便各位学员能更加系统地掌握考试大纲的重点知识,帮助大家充分备考,体验实战,高顿网校开通了全免费的ACCA题库(包括精题真题和全真模考系统),题库里附有详细的答案解析,学员可以通过多种题型加强练习。戳这里进入ACCA免费题库>>>

微信扫一扫,关注ACCA*7资讯,满满的干货喂饱你!ACCA微信公众号:gaodunaccaACCA分享与交流QQ群:227573128 

展开全文